Piping spools, tanks and vessel components, chemical feed skids, platforms, ladders and handrails, and structural supports for treatment equipment.
Typical scope
Stainless and coated carbon steel fabrication
Chemical feed and dosing skids
Structural platforms and access
Field modifications during plant upgrades
Repairs and alterations
How we address the realities of this industry
Sector requirements are treated as design inputs, not as exceptions to be resolved in the shop.
Corrosion and chemical exposure
Materials, welding procedures and inspection are selected for the service conditions described in the datasheet.
Material selection support
Documentation is planned at bid stage so the dossier is complete when the equipment ships.
Live-plant constraints
Schedules are built around plant windows and shutdown dates, with fabrication started ahead of the outage.
Skid-based packages that minimize on-site work
Shop-complete assemblies reduce field hours, scaffolding and the risk of site rework.
Codes and standards applied
Requirement
Application
Design code
Stainless and coated carbon steel fabrication
Fabrication code
Chemical feed and dosing skids
Welding qualification
ASME Section IX and AWS D1.1 as applicable
Documentation
MTRs, weld maps, NDE reports, test records
Frequently asked questions
Does Daniel Steels fabricate for Water & Wastewater projects?
Yes. Daniel Steels Manufacturing LLC fabricates process piping, pressure vessels, skid units, pipe racks and structural steel for Water & Wastewater projects from its Houston, Texas shop.
Which codes apply to this industry?
Stainless and coated carbon steel fabrication. Chemical feed and dosing skids. The applicable code is confirmed against the project specification before quoting.
Can you support an outage or turnaround?
Yes. Fabrication can be scheduled ahead of the outage, and field services can be mobilized for installation, repairs and alterations under the National Board “R” Stamp.
What information is needed for a quotation?
Isometrics, P&ID, datasheets or a scope narrative, together with the applicable code and any material or inspection requirements.
Discuss a Water & Wastewater fabrication scope
Send the drawings or datasheets and we will review constructability, code requirements and schedule.