ASME Section VIII Division 1 vessels fabricated under the “U” Stamp, from small accumulators to multi-phase separators.
Each project is fabricated against approved drawings and the applicable code, with inspection planned before fabrication begins. Depending on scope, the delivery package includes mill test reports, weld maps, welding procedure and welder qualification records, non-destructive examination reports, pressure test records and as-built documentation.
Fit-up and final dimensions verified before release.
ASME "U", National Board "R", ASME IX and AWS D1.1 as applicable.
Material certificates linked to heat numbers and welds.
Tagged and sequenced for efficient field installation.
Send drawings, datasheets or a scope narrative and we will confirm feasibility, code requirements and schedule.